Iso-Mount Type2 installation guide - option 1
Fixing directly through plasterboard into timber joists without removing the old ceiling. Creates a new isolated ceiling with a 50mm deep void for additional insulation.
Fixing directly through plasterboard into timber joists without removing the old ceiling. Creates a new isolated ceiling with a 50mm deep void for additional insulation.
Fixing directly through existing plasterboard into timber joists without removing the old ceiling, using an extended hanger assembly.
Fixing directly onto a concrete ceiling. Creates a new isolated ceiling with a 50mm deep void for additional insulation
Fixing directly on to concrete using the concrete hanger extension fixed to the concrete. Creates a new isolated ceiling with a larger variable void for additional insulation and services.